Dimensional control is done throughout the whole production process to verify that the required dimensions and specifications are met.
When required, a full scale fit-up test can be carried out on structures to verify the dimensions as an assembly. Fit up dimensions can be verified by 3D-scanning. Fit-up tests and dimensional control is also a part of the final inspection, which can be carried out together with the customer.
Noble Installation AS was established in 2000. Our business is to a large extent focused on delivery of services and products within engineering and manufacturing to the offshore and maritime sector, and land-based industries, world wide.
© 2023 Noble Installation AS - Utviklet og designet av Verdi Media Norge AS | Personvern